If Mullaperiyar and Idukki dam smashed, kerala will break into two parts. This is reported by Central Soil and material research station team. Intelligence collected this secret report. The scanning of upstream side of the Mullaperiyar dam using a remote operated vehicle by the Central Soil and Materials Research Station on directions from the Empowered Committee of the Supreme Court had found serious damage to the masonry structure between 95 to 106 feet from the base of the dam, retired engineer M. Sasidharan who was observer of Kerala during the scanning said in a report to the government.It is reported that examination conducted as per the instructions of the high power committee of the Supreme Court have found severe cracks on the Mullaperiyar dam. The cracks were found in the examinations conducted by the Central Soil and Material Research station. If Mullaperiyar fails, Idukki reservoir will be affected, as a result Kerala topography will be changed by dividing the state into two regions. This confidential report has been gathered by Intelligence dept.
The studies were carried out for Kerala govt by expert team including Dr. P.K.Thampy (former CESS Geoscience head), Dr. A V George (M G University Disaster Management dept head) and geological science of India former head Dr. M.N. Nair. Idukki dam has a capacity of holding 70 TMC water and 79% of it is already filled. Hence it won’t be able to hold the water coming from Mullaperiyar and it would also collapse leading to a flood of enormous magnitude which would wash away four districts of Kerala.


11:27 PM
freeplays
Posted in:
0 comments:
Post a Comment